Troubleshooting Project Setup
Problems creating or configuring projects.
Where to look
Open the project's Settings → Setup page. It shows the status (Not started, In progress, Ready, Action required), a checklist and a Blockers list with Fix links.
"New project" is blocked
- Only Admins can create projects.
- You may be at your plan's active-project limit. Archive a finished project or upgrade (Plans and limits).
The project says "Draft — activate to report"
New projects start as drafts. Click Activate project in the banner at the top of the project (you need permission to edit the project). A paused project shows Resume project and an archived one Restore project.
A setup request fails with "Validation failed"
The message now names the field and what is expected, for example acknowledged: Send {"acknowledged": true} to confirm the setup. Fix the named field and try again.
"A project with the code … already exists in this workspace"
Project codes are unique in a workspace. The wizard tells you as soon as you type a taken code on Project and team (and again on Review and launch, where Start the project waits until it is changed). If you still see the message at launch, go back to Project and team, change the project code, and start the project again. Nothing is created twice: starting is safe to repeat.
"Choose which result … measures"
The wizard did not put a library indicator under a result because none of your results fits its wording (for example an education indicator in a water project). Open Indicators and pick a result in that indicator's Measures box. On an existing project, the same indicator is skipped with "Choose where it goes": choose a result when you add it.
"Use the starting answers" did not fill anything
It fills only what is empty, so it does nothing when everything it offers is already answered. If another save was running at the same moment it tries again by itself. The button waits until the draft is ready (for example while documents are still being read).
"The request timed out" when I read my documents
Each file is stored in your Google Drive one after the other before the wizard reads it, so several files take longer than one. The wizard now waits up to about 100 seconds. If it still times out, choose fewer files (three spreadsheets read well together), then enter the places and the budget on their own slides. Make sure Google Drive is still connected under Settings; an expired connection gives a different message and asks you to reconnect.
My work plan repeats every month but only the first month was made
Put a Repeats column (Weekly or Monthly) in the work-plan sheet before you read it. The Work plan slide then says "Repeats every month until the project ends" on those rows and the launch plans every month to the end date. A repeat is not set by hand in the wizard yet; if a row lacks it, fix the sheet and read it again, or add the later months afterwards with Plan → Work plan → Import a sheet (use dates in the next month and Repeats = Monthly; rows that already exist are skipped, never doubled). Leads named in the sheet are not read from a document: choose each lead on the slide.
Setup says "44 reportable of 55"
A quantitative indicator needs a starting value, a target, a unit and a frequency before it counts as reportable. The line now says what is missing, for example "11 need a starting value." Open the indicators and fill in the gap. Rates that you marked "No starting value" in the wizard are counted as missing a starting value until you give one.
I lost my wizard answers
Wizard progress is saved as a draft in your browser. Reopen New project on the same device and browser.
Project workspace folder is pending or failed
- Make sure Google Drive is connected (Settings → Workspace setup).
- On the project's Settings → Setup page click Retry workspace. If folders are partly there, click Repair workspace.
- If it still fails, reconnect Drive and retry, or email support@donordesk.online.
Setup stays "Action required"
Readiness is computed from live data. It reverts if something required is removed. Fix the listed blockers:
- Donor template – needs at least one reviewed required section (upload and approve one).
- Indicators – at least one, and every quantitative indicator needs baseline, target, unit and frequency.
- Reporting profile – create it on the profile page.
Team assignment is recommended but does not block.
I can't edit dates or budget
Use the project's Settings → Project settings (Admin or Project Manager). Changing dates that would invalidate existing reporting periods is rejected.
Archived or completed projects
Completed projects cannot get new periods; archived projects are read-only. Restore project in Settings for archived ones.
Demo project problems
The demo project cannot be counted against your plan. If the tour will not start or resume, refresh, or delete the demo project from its banner and start again.