How to Record a Change of Plan

Write down what changed, why, and what it did to the results.

When something changes, write down what changed, why, and what it does to the results. A change written this way can be explained in the report and checked against it.

When to record one

Record a change when an activity moves, is dropped or replaced, when a target or method changes, or when a delay affects results. Record it when you decide it, not at the end of the year.

Record it

  1. Open the project and go to Reports → Changes of plan.
  2. Under Record a change, fill in:
    • Day it changed: the date the change was made or took effect.
    • What changed: one or two sentences, for example "Moved borehole drilling to the dry season".
    • Why: the reason, for example "Access roads were flooded".
    • Effect on results (optional): for example "Two water points slip to the next quarter".
    • Indicator it touches and Report it belongs to (optional).
  3. Select Record the change.

The newest change is at the top of the log. Each entry shows its date, what changed, why, its effect and its links.

Good to know

  • The indicator and report links must belong to this project.
  • A correction changes only what you edit. Clearing the effect or a link empties it.
  • A dated change can be cited when a report statement about the change is checked.
  • Changes are kept in the audit trail, including the text before an edit.