How to Create a Reporting Period
Start a report cycle for a ready project.
A reporting period is one report cycle for a project: for example "Q3 2026 progress report". It holds the period's indicator values, activities, evidence, story, draft and exports.
Before you start
The project must be Ready on its Settings → Setup page (workspace folder, reviewed donor template, indicators with baseline/target/unit/frequency, and a reporting profile). Until then, creating a period is blocked and the Settings → Setup page tells you what is missing. Completed or archived projects cannot get new periods.
Steps
- Open Projects → project → Reports and click Create reporting period. The page is called New report; for the closing report use its Final (closing) report button (how).
- Read the What you can create panel at the top: it shows which report types are available now and, for the others, why and what to do instead. Then choose the Report type: Monthly, Quarterly, Semi-annual, Annual, Final, Activity, Situation or Custom. Activity, Situation and Custom reports ask what they cover: Activity — tick the activities the report is about; Situation — the event, the "as of" date, optionally the date the event started (the report then covers that window), location, summary, affected-population figures (who, figure, source, date; a half-filled row is flagged, not dropped) and main needs (one per line, 200 characters each); Custom — a title and optional purpose. These reports can sit inside a Monthly or Quarterly period.
- Check the Donor template. It is already chosen for you: an approved template written for exactly this report type, otherwise your project's default, otherwise the built-in structure. The choice says · default for this type. Change it, or pick Built-in structure (no template); your choice is kept. Unapproved templates are marked "not approved yet". The template is pinned to the period (you can change it later, see How to change a report's template).
- Start date and End date are suggested from the report type and the project's dates. Each new period is chained after the previous one and clipped to the project's end date. Adjust if the donor uses different cut-offs.
- Donor deadline is calculated from the template's deadline setting where it has one. Add an Internal review deadline (optional) earlier than the donor's.
- Save.
Regular periods (Monthly to Annual and Final) must not overlap each other and must fall inside the project dates. A Final report closes the cycle: create it for the closing period (for example the last month), not over periods that already exist; the guided closing report does this for you. For a one-off report over dates that already have periods, use a Custom report.
Create the whole calendar in one click
For a project that reports monthly or quarterly, the Reporting page shows Set up the whole reporting calendar, for example 5 periods: Mar 2026 – Jul 2026. The last one (Aug 2026) is the closing report, created from its own steps. Click Create all 5 periods, or Create just the next one to add only the next period (for example this month's) and leave the rest for later. The periods are created one after another with the same checks as above, each with its donor deadline. If one is refused you see which and why, and the others are still created. Running it again never makes duplicates.
The last block of the project is not created here: it belongs to the closing report. Auto-create reporting periods (a reporting-profile setting, on by default) follows the same rule: it creates each regular period once its month is over and never creates the last block, so the closing report can still be started.
After creating it
The period workspace opens on Ready to write this report. It lists three things to check, each with a button: Indicator values (Review data or Enter data), Story answers (Answer now) and Evidence (Add more). When you are ready, click Generate report. Each item shows how complete it is (for example 24 of 33 verified), and you can generate before everything is green: unverified figures are marked in the report. See Understanding the reporting workflow.
Cancel a period, restore it, or make it the final report
On Reports, each period offers what it may do, for people who can edit the project:
- Cancel period: takes a period out of the calendar when it was created by mistake. Nothing is deleted: its data stays, and it no longer blocks the dates, the closing report or comparisons. Cancelled periods are listed at the bottom of the page. A period with an approved or exported report cannot be cancelled; reopen the report first if it was approved by mistake.
- Restore period: puts a cancelled period back, unless another period now covers its dates.
- Make this the final report: shown on the last regular period (for example, a final month that was created as a regular month). It becomes the project's closing report. This works only when no later period exists, the project has no final report yet, and nothing on the period has been approved.
Every one of these is recorded in the audit log.
Period status
Not started → In progress → Evidence collection → Draft generated → Under review → Approved → Submitted → Closed. See Report statuses.
Report structure. A donor template is optional. Without one, the report uses a ready-made structure for its type. Activity and Situation reports can only use a template of their own type. Activity dates come from the activities you tick, Situation dates continue from the previous report on the same event (reports are numbered #1, #2…), and their deadlines default to 7 and 3 days.